Please see details below:
– From 30 July to 14 August: between Oxford and Didcot Parkway to enable Network Rail (flood prevention work in the Hinksey area)
– From 30 July to 7 August: between Oxford and Banbury (re-signalling work)
– From 3 to 7 August: between Oxford and Hanborough (bridge repair work)