New High Street residents have reported to us the problems they are having with parking at the moment while the builders’ vans are so much in evidence. Parking is never plentiful in the area and with two construction sites operating at the same time, we understand how significant this problem must be for everyone.
We asked the parking enforcement officers to carry out a series of visits to try and reduce the frequency with which the vans are parked up in visitor spaces. Here is our latest report from NSL:
The commercial vehicles in All Saints Road are parking in the 2 hour timed bay that we are logging, but they move when we return, any vehicle that is on the Double Yellow Lines just move before we can issue a Penalty Charge Notice.
Since the complaint we have made 32 visits, logged 18 vehicles, and have not issued any Penalty Charge Notices.
We will continue to make visits to this location to ensure vehicles are parked legally.
We shall continue to press for continuing patrols.
We were alerted by residents’ associations to the poor quality of trench filling (re-instatement) by the construction workers and utilities companies. We called in the County officer who liaises with them and he reports:
Regards the utilities works, I visited on the 6th. I did note that there were two sets of works on opposite sides of the road. Was concerned as this was affecting traffic as this left no room for vehicles to wait at the four way junction. Parties were Scottish and Southern Electric and Southern Gas. I phoned Southern Gas and was told their works should have been cleared that day and would chase up for clearance on Saturday. The electric works were on-going. I found it unacceptable that two utilities were there at the same time as road space is limited.
We have called in Building Control to make a site visit to ensure the quality of work is acceptable and heard today that all utility sites are now cleared and defective trenches made good.