Here is an update from last night’s open meeting. The news is good in that they are going to retain a couple of pieces of toddler play equipment after all, and they are hoping to put a proper boundary around the play area comprising hedges and fencing, both wooden and metal, so that should sort out the concern about dogs.And yes! there WILL be a zip wire! And a ship like structure (allegedly), a rope bridge over a hollowed out pit, a low wall children can climb over but high enough to keep the dogs out, a sandpit, big stones/rocks to walk on, springy ‘stepping stone’ platforms to walk on or springy ride-ons, etc. The theme is to use natural materials like wood and stone whenever possible to tie in with the park’s featuresI’ve asked them about further consultation, they say they’d like to put out the contract to tender by 6 September, and we discussed the possibility of them putting up their design plans in either Bury Knowle Library or the Baptist Church towards the end of the month so people can look at them and make comments – they don’t have these plans finalised yet but may be able to provide a link electronically at some point in the near future, I’ll post it up when I
get it
Some good points from parents this afternoon – face the slide away from the sun as it gets too hot, and put a slope up in front of the swings to stop toddlers running in front of them and getting hit. Lots of questions about disabled access too. Toddler play equipment appears to be divvied up across the whole area rather than in one toddler zone – views, anyone?
Notional timelines liable to slippage: order equipment beginning of October, start the work mid November, complete January 2011 though subject to weather conditions. Fortunately delays in the process have meant work won’t take place over the summer, that’s a relief!